IT Examiner School, Providence, RI
Testing Methods
Tabletop Exercise/Stru ctured Walk‐ Through Test
Walk‐ Through Drill/Simulati on Test
Testing Methods
Full‐ Interruption/ Full‐Scale Test
Functional Drill/Parallel Test
Administer the Plan
As a result of risk monitoring, management should update their BIA, BCP, and DRP.
What other triggers would require the plan to be updated?
Made with FlippingBook Annual report