IT Examiner School, Seaside, CA
Risk Assessment Red Flags
• The risk assessment does not incorporate both technical and nontechnical risks
• The risk assessment is not reviewed and updated at least annually (should be more often if there are significant operational changes).
• Audit (controls testing) results do not impact the risk assessment and/or the risk assessment does not impact the audit scope & frequency.
IT Exam: Contracting the Depth of the Risk Assessment Review
• May be able to significantly contract the depth of the risk assessment review when: – The risk assessment was recently reviewed by a qualified auditor and found to be adequate. – There have been no changes in management or the environment since the last examination. – The quality of the risk assessment process has been validated.
Made with FlippingBook - Online catalogs